June 2018
The chassis is slung
ready for the lift
Lifted into the air…
… and lowered onto
the waiting axles
The torque bar
fastens the
gearbox.
Fuel tanks are lifted
into place.
The cab is prepared
for fitting
…arm rests are
welded onto the
cab…
… and the cab is
lowered onto the
fuel tanks.
Everything is
brought together
and tightened up.
Linkages are
prepared for the cab
Brake arms are
fitted to the chassis
Vacuum pipes are
put into place
Engine mountings at
the front…
… and rear.
newly painted
vacuum tank.